BHP Billiton Ltd, Australia's biggest oil and gas producer, says the $1.16 billion Neptune oil operation in the Gulf of Mexico is facing further delays and cost increases after structural problems with the platform.
BHP Billiton, which holds a 35 per cent interest and operates the project, said additional reinforcement was required in the platform. ....click the link to read more
"A good scientist is a person with original ideas. A good engineer is a
person who makes a design that works with as few original ideas as
possible" - Freeman Dyson